Friday, November 27 12noon-1 pm is the first step in public consultation (PIC)for the above. This masterplan sets out the requirements for managing stormwater in existing settlement areas and other defined in the study area. The latter includes the 3 villages and 7 hamlets. There will be another PIC later in winter; final report targeted for spring 2021. As this PIC will be virtual it is necessary to register to participate at KingStormWaterMasterplan@civi.ca Here is the project page with some more information.
0 Comments